UARC? - People - Partner Institutions - Campaigns - Resources - Search - Outreach
link tree below "Campaigns"
Instructions - Start session - Objectives - Schedule - Instruments - Bugs - Rules of the road - News -

<-- to UARC's homeSchedule of availability of instruments and models for October 19 - 21, 1998, SPARC Campaign
(updated October 17, 1998)

The October 1998 SPARC Campaign coincides with a Wide-Latitude Substorm Dynamics (WLS) Campaign.


Real-time availability
Tentative availability
Participating, but
      not real-time

Place your cursor over a bar to read details about the availability of an instrument or model.

October 1998

Monday, 19th

Tuesday, 20th

Wednesday, 21st

Instruments
& Models

Comments

time scale for schedule graph Time (UT hrs)
tick marks for schedule graph
POLAR UVI: 10.19: 6:30-8:30, 11:45-13:30, 16:05-17:55;  10.20: 0:10-3:20, 8:20-10:10, 13:45-15:40, 22:00-23:50;  10.21: 0:30-2:20, 5:00-6:50, 11:50-13:40, 16:20-21:20 UT POLAR UVI
POLAR VIS: switched off POLAR VIS Switched off
Millstone Hill: 1400 UT Oct 19 to 0200 UT Oct 22 MHO Radar
Sondrestrom ISR: 1600 UT Oct 19 to 1600 UT Oct 21 SFJ Radar
EISCAT Tromso: 1000 UT Oct 19 to 1600 UT Oct 21 Tromso
EISCAT Svalbard: 1000 UT Oct 19 to 1600 UT Oct 21 Svalbard
Arecibo: 1500 UT Oct 19 to 2200 UT Oct 21 Arecibo
Jicamarca ISR: information to come Jicamarca Times unknown
SuperDARN: operates continuously SuperDARN
JPL-GPS-TEC: on now and scheduled to remain on GPS-TEC
TING Model: not in operation during campaign TING
TIGCM Model: will replace TING; not yet guaranteed TIGCM TIGCM model will probably replace TING; not yet guaranteed
ACE Spacecraft: information to come ACE
Digisondes: all but Hanscom currently on; Okinawa is different format Digisondes all but Hanscom currently on; Okinawa is different format
Sondrestrom IRIS: operates for duration of campaign IRIS
Sondrestrom Magnetometer: operates for duration of campaign Sondre Mag
Sondrestrom Riometer: operates for duration of campaign Sondre Rio

SPARC's homearrows-3-left.GIF (183 bytes)
Send questions or comments to uarc@crew.umich.edu.
© 1998 Regents of the University of Michigan.
Schedule interface design by
Marie CooperFrank DeSanto.
U-M School of Information Software Systems Research Lab @ U-M Space Physics Research Lab @ U-M

Collaboratory for Research on Electronic Work
CREW

National Science Foundation

19 April 2000